VINs / 2019 / GMC / Sierra / 1GTU9DED7KZ422310

2019 GMC Sierra

Vin: 1GTU9DED7KZ422310
Type: Pickup
Year: 2019
Make: GMC
Model: Sierra
Trim: SLT
Series: 1500
GVWR: ?
GMC

Engine

Model
L84 - DI, DFM, ALUM, GEN 5, VAR 2
Fuel
Gasoline
Displacement(Liters)
5.3
Cylinders
8

Drive Trian

Type
4WD/4-Wheel Drive/4x4

Manufacturer

Manufacturer
GENERAL MOTORS LLC
Plant City
FORT WAYNE
Plant State
INDIANA
Plant Country
UNITED STATES (USA)

Safety Features

Air Bag Location(Front)
1st Row (Driver and Passenger)
Air Bag Location(Sides)
1st Row (Driver and Passenger)
Seat Belts(All)
Manual
Brake System Type
Hydraulic

Do you manage a fleet?

FleetChaser will help you track:

  • Mileage and maintenance
  • Filling and expenses
  • Real-time technical condition

Learn More

You'll never want to go back to how your fleet operated before Fleet Chaser

Our construction fleet management software makes your fleet management better, safer, and easier.

Free Trial

Construction and Fleet Management Articles

Fleet Chaser draft task card on the dispatch board Drafts: Never Lose a Half-Built Task
Setting up a real job takes a few minutes — a route, products, a crew, a schedule. Get interrupted halfway and that half-built task used to be gone. Drafts fix that: while you build a task, Fleet Chaser saves it automatically, so you can step away and pick up exactly where you left off. A draft stays private and silent — no task number, no notifications — until you press Create task.
Cameras Overview Cameras Overview - More Than Just a Location on the Map
You know where your vehicle is. But do you know what's happening around it? That's why we introduced the Cameras Overview tab in Fleet Chaser. Now, dispatchers, safety managers, or operations leads can quickly see exactly what's going on - directly through the cameras installed in your vehicles.
Route Planning: Map the Job, Then Let It Run Itself Route Planning: Map the Job, Then Let It Run Itself
Route Planning turns a multi-stop job from "an address typed into the task description" into a real itinerary you draw on a map. Color-coded Load, Delivery, and Job Site checkpoints, drag to reorder, addresses or saved Locations, and an Employee App that walks the driver through the route in order — including the Job Site stops that hold the line until the work there is logged.
Progress: See Exactly How the Work Got Done Progress: See Exactly How the Work Got Done
The Progress tab is the single place that shows how a task was actually worked — built from real entries drivers create as they go, not a summary someone reassembled later. A per-employee timeline, live per-product totals, and a filterable log of every load and delivery, with every edit kept on the activity log so corrections never erase the truth.
Last activity Introducing Last Activity View
The last activity view is already in your account. This feature enables you to instantly view info on trucks’ activity in certain locations. No need to search info on the last activity manually: it will be displayed neatly right next to each location’s name. Stay updated and have a nice day ahead!
What Is Fleet Management Technology Blog Image What Is Fleet Management Technology, and How to Choose the Right One?
Managing a fleet has never been more challenging. Rising insurance premiums, unpredictable fuel costs, and growing maintenance costs combined with the need to keep equipment running efficiently on tight schedules…
Vehicle Notes Vehicle Notes - Always Have Vehicle Details on Hand!
Ever needed to record specific vehicle information that you can’t quite assign to your existing data categories? With notes, important vehicle details are safe in one place, always at your disposal. This can be repair shop inspections, vehicle documents, legal information, etc.
A Fleet Chaser task card moving itself from the Backlog column onto the active dispatch board Schedule Automation: Let Tomorrow's Jobs Show Up on Their Own
Most dispatchers still drag tomorrow's jobs onto the board every morning. Schedule Automation removes the ritual — set a rule on a workflow once, and planned tasks promote themselves onto the active board when their start time is near. It reacts when plans change, and you can still promote any job by hand in one click.