VINs / 2012 / Kia / Sorento / 5XYKW4A28CG218247

2012 Kia Sorento

Vin: 5XYKW4A28CG218247
Type: Sport Utility Vehicle (SUV)/Multi-Purpose Vehicle (MPV)
Year: 2012
Make: Kia
Model: Sorento
Series: TOP (High Grade)
GVWR: ?
Kia

Engine

Model
V6 MPI LAMBDA-II
Fuel
Gasoline
Fuel Injection Type
Multipoint Fuel Injection (MPFI)
Displacement(Liters)
3.5
Cylinders
6
Configuration
V-Shaped

Drive Trian

Type
4x2

Manufacturer

Manufacturer
KIA GEORGIA, INC
Plant Company
Kia Motor Manufacturing, Georgia
Plant State
GEORGIA
Plant Country
UNITED STATES (USA)

Safety Features

Air Bag Location(Front)
1st Row (Driver and Passenger)
Air Bag Location(Sides)
1st Row (Driver and Passenger)
Seat Belts(All)
Manual

Do you manage a fleet?

FleetChaser will help you track:

  • Mileage and maintenance
  • Filling and expenses
  • Real-time technical condition

Learn More

You'll never want to go back to how your fleet operated before Fleet Chaser

Our construction fleet management software makes your fleet management better, safer, and easier.

Free Trial

Construction and Fleet Management Articles

A Fleet Chaser crew of three assignees on one task, each with an individual status indicator Multi-Assignee Tasks: One Job, the Whole Crew
Some jobs are too big for one driver. Multi-assignee tasks let you put the whole crew on a single task — each person with their own vehicle, status, and progress — while loads and deliveries are counted automatically into one shared total.
Image_blog_adaptation (2) Introducing Fleet Chaser Notifications: Never Miss a Critical Update Again 🚀
In a fast-paced fleet management environment, staying on top of important updates is crucial. That’s why we are introducing Fleet Chaser Notifications—a centralized system designed to ensure you never miss critical alerts while avoiding unnecessary distractions.
Navagation Navigation Upgrade: A Cleaner, Smarter Way to Move Through Fleet Chaser
Fleet Chaser navigation just got an upgrade — dark theme, grouped sections, and a collapsible sidebar with 3 states. Here's what changed and where things moved.
Fleet Chaser at Charlotte Build Expo 2024 Fleet Chaser at Charlotte Build Expo 2024!
We’re excited to announce that Fleet Chaser will be at the Charlotte Build Expo 2024 on December 11-12 at the Charlotte Convention Center. This is your chance to connect with us in person and learn how we’re helping SMBs in the construction industry take control of their fleet operations.
Using FleetChaser to Reduce Fleet Downtime/Breakdowns Using FleetChaser to Reduce Fleet Downtime / Breakdowns
Unexpected downtime presents a tangible setback for your fleet. Not only is your asset now off the road, but you have to tweak your operations and allocate finances to accommodate for it.
Dash Camera Introducing Enhanced Camera Interface
Discover our major updates to the Dash Camera section, designed to streamline your fleet management: - Enhanced Camera Interface: Enjoy an updated design with a new timeline feature for easy video status tracking. - Improved Live Section: Clearer status indicators for real-time camera monitoring. - Upgraded Saved Media Section: Organized media tabs and date sorting for effortless access to your recordings. Explore these new features for a more efficient fleet management experience.
Fleet Chaser QR code in a scan frame — scan a vehicle to start its inspection QR Codes Are Live — Scan a Vehicle, Start Inspecting
QR Codes are live in Fleet Chaser. Drivers scan a sticker on any vehicle to jump straight into the right inspection — no searching, no typing — and managers link a code to a vehicle right from the Console in seconds.
Fleet Chaser draft task card on the dispatch board Drafts: Never Lose a Half-Built Task
Setting up a real job takes a few minutes — a route, products, a crew, a schedule. Get interrupted halfway and that half-built task used to be gone. Drafts fix that: while you build a task, Fleet Chaser saves it automatically, so you can step away and pick up exactly where you left off. A draft stays private and silent — no task number, no notifications — until you press Create task.